Page views this IP this session = 1 of 10 unsubscribed pagesHornsea One Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Hornsea One Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Hornsea One Wind Farm (Wind , Active) Location in the UK : England, North Sea, North of East Anglia Type of installation: Wind on/offshore: off Turbines :174 Capacity : 1218 MW Approx Date of 1st power generation: October 2020
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Hornsea Project One and Two
The Hornsea zone has the potential to provide enough electricity to meet approximately 4% of all electricity demand in the UK and power approximately 3 million homes.
The UK goal for renewable electricity generation is approximately 30%. Hornsea's offshore generation could account for approximately 12% of that target.
The width of the Hornsea zone is approximately equivalent to the width of the UK from Liverpool to Hull.
The total zone area is 4,735 km².
The zone lies between 31km and 190km off the Yorkshire coast.
Water depths across the zone are predominantly between 30 and 40m, with maximum depths to 70m.
The zone is adjacent to the River Humber, 200km south of Newcastle and 75km north of The Wash.
The Humber estuary is triangulated by three main population centres, Hull to the north, Grimsby to the southeast and Scunthorpe to the southwest. Part of an impressive array dotted over 407 km2 of North Sea more than 100km from the Yorkshire coast the final turbine completes the 174-strong array of turbines, which make up the world’s largest offshore wind farm. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hornsea 1 - Heron & Njord 1218 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2525 / B0263
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
EN010033
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
174 |
Turbine Capacity: |
7 |
Height of Turbines: |
|
Calculated capacity: |
1218 |
Site Address: |
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
626000 / 626000
|
Development Status: |
Operational
|
Application Submitted: |
7/30/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/26/2018
|
|
|
Generator Live |
12/1/2019
|
This Record Last Updated: |
9/3/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 1218 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/4/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|